-
15:10
PO33 - Importance of first response learned from a water leak trouble in vacuum
-
Keita Fukushima
(AEC)
-
15:10
PO25 - Dependency Tracking Tools for Outage Planning
-
Matt Gibbs
(SLAC)
-
15:10
PO29 - Consolidated Alarm Panel – Improving Alarm Management and Operator Response
-
Steven Young
(TRIUMF)
-
15:10
PO34 - Some Like It Hot: Lessons Learned at RHIC from Summer Running
-
Ian Blackler
(BNL)
-
15:10
PO44 - Unexpected failures and their conequences during beam time
-
Markus Vossberg
(GSI)
-
15:10
PO45 - New and old methodology of alingnment and instruments used for Elettra and Elettra 2.0
-
ALESSANDRO CORONICA
(Elettra)
-
15:10
PO43 - Bunch length monitoring using a spectrum analyzer
-
Javier Bañuelos Sánchez
(ALBA)
-
15:10
PO01 - Dual disciplinary beam injections for particle physics and photon science experiments
-
Kazuro Furukawa
(KEK)
-
15:10
PO06 - How we do business at Los Alamos Neutron Science Center
-
Eron Kerstiens
(LANL)
-
15:10
PO09 - How to rejuvenate personnel protection system of SuperKEKB
-
Toshihiro Mimashi
(KEK)
-
15:10
PO14 - Timestamp synchronization of beam diagnosis system
-
Hiroshi Kaji
(KEK)
-
15:10
PO20 - Impact of Accelerator Physics Involvement for Accelerator Operations
-
Minwoong Oh
(BNL)
-
15:10
PO02 - Operation group redeployment during extended shutdown (dark time) - The CLS case
-
Frédéric Le Pimpec
(CLS)
-
15:10
PO13 - The Beam Diagnostics System in the J-PARC 3 GeV Rapid Cycling Synchrotron
-
Kazami Yamamoto
(J-PARC/JAEA)
-
15:10
PO41 - Modernization of the GSI Pager System for the FAIR Control Room
-
Christian Schmidt
(GSI)
-
15:10
PO42 - Incidents caused by earthquakes and storms, and how to detect them
-
Tatsuki Goto
(AEC)
-
15:10
PO03 - Summary of the operation of CSNS accelerator since its official opening in 2018
-
Yue Yuan
(IHEP)
-
15:10
PO22 - Accelerator Operators involvement with commissioning the BRIGHT beamlines
-
Thomas Sanders
(AS/ANSTO)
-
15:10
PO04 - General organization for LIPAc beam operation
-
Dominique GEX
(F4E)
-
15:10
PO05-The operation status of linac and multi-beamlines and beam tuning procedure for beam service
-
Sang-pil Yoon
(KOMAC)
-
15:10
PO08 - The Fermilab Accelerator Division Electronic Logbook (ADEL) at 10 Years, Lessons Learned and Looking Ahead
-
Kyle Hazelwood
(FNAL)
-
15:10
PO10 - The LIPAc Operation Logbook: a monitoring and reporting asset for operation supervision
-
Lucas Maindive
(U-Granada)
-
15:10
PO11 - Design of the web Application for improving the management of the data at KOMAC
-
SungYun Cho
(KOMAC)
-
15:10
PO12 - User interface of operation status and beam permit system for beam service at KOMAC
-
Young-gi Song
(KOMAC)
-
15:10
PO15 - Challenging quest of three-dimensional spiral injection scheme to store the 80 keV electron beam in 12 cm diameter ring
-
Hiromi Iinuma
(Ibaraki-U)
-
15:10
PO16 - CLS Operation Visual Aids
-
Alexander Nikolaichuk
(CLS)
-
15:10
PO17 - Operational tool for management of electromagnet power supplies at RIBF
-
Akito Uchiyama
(RIKEN)
-
15:10
PO18 - Development of Web Applications for SRILAC Operation
-
Kenta Kaneko
(SHI)
-
15:10
PO19 - Preparing the commissioning of FAIR
-
Stephan Reimann
(FAIR/GSI)
-
15:10
PO21 - Fermilab Accelerator Complex Evolution & the Main Injector Synchrotron
-
Martin Murphy
(FNAL)
-
15:10
PO23 - The Accelerator Operators role in making adaptive tuning effective.
-
Peter Naffziger
(LANL)
-
15:10
PO24 - An S-Band Variable Waveguide Power Divider and Combiner for High-Vacuum and High-Power Applications
-
Xiang He
(IHEP)
-
15:10
PO26 - Operation and Maintenance at a Compact Synchrotron Radiation Facility SAGA-LS
-
Yoshitaka Iwasaki
(SAGA-LS)
-
15:10
PO27 - Current Status of UVSOR-III Synchrotron Radiation Facility
-
Kenji Hayashi
(UVSOR)
-
15:10
PO28 - Current Status of Refurbished Target Irradiation System for Radioactive Isotope Production Using an Electron Linear Accelerator at Research Center for Electron Photon Science, Tohoku University
-
Ken Takahashi
(Tohoku-U)
-
15:10
PO30 - Report on Alarm Management of synchrotron SOLEIL
-
Didier TREVARIN
(SOLEIL)
-
15:10
PO31 - LANSCE Fast Protect System Modernization
-
Joseph Snyder
(LANL)
-
15:10
PO32 - Responding to Alarms and Warnings
-
Jonathan Warren
(SLAC)
-
15:10
PO35 - AGILE REGULATORY OVERSIGHT: ADAPTING REGULATIONS TO ACCOMMODATE RAPIDLY CHANGING ACCELERATOR TECHNOLOGY
-
Mike Heimann
(CNSC)
-
15:10
PO36 - Sequencer tool for automatisation of repetitive HW tasks
-
Oksana Geithner
(GSI)
-
15:10
PO38 - Measurement of temperature and humidity in accelerator tunnel by Raspberry Pi
-
Shuhei IWABUCHI
(KEK)
-
15:10
PO40 - Topup injection in the collision operation of BEPCII and key technology
-
GuangHui Chen
(IHEP)
-
15:10
PO39 - RF Control for Suppression of Beam Instabilities due to Accelerating Mode in SuperKEKB
-
Tetsuya Kobayashi
(KEK)
-
15:10
PO46 - Tools / Developments done by the ESRF Operators
-
Gilles Chazot
(ESRF)
-
15:10
PO47 - Current Status of the Control System at Research Center for Electron Photon Science, Tohoku University
-
Ikuro Nagasawa
(Tohoku-U)
-
15:10
PO48 - Python-based Operator Tools and Interfaces at SNS
-
Jonathan Rye
(SNS)
-
15:10
PO37 - Development of remote participation tools for LIPAc operation
-
José Franco Campos
(QST)
-
15:10
PO07 - The Control and Data Acquisition for HEPS Linac High-Power RF Source System
-
Jingdong Liu
(IHEP)