-
11:00 AM
Upgrade plan of MicroTCA based event timing system at KEK LINAC
-
Di Wang
(KEK)
-
11:20 AM
Operation status of MTCA.4 based LLRF control system for the J-PARC MR
-
Yasuyuki Sugiyama
(KEK/J-PARC)
-
11:40 AM
Development of MTCA-based boards for the LLRF at the KEK PF 2.5 GeV ring
-
Daichi Naito
(KEK)
-
12:00 PM
Current Status of the LLRF System for the Muon Linac of g-2/EDM Experiment at J-PARC.
-
Ersin Cicek
(KEK)