-
11:00
Upgrade plan of MicroTCA based event timing system at KEK LINAC
-
Di Wang
(KEK)
-
11:20
Operation status of MTCA.4 based LLRF control system for the J-PARC MR
-
Yasuyuki Sugiyama
(KEK/J-PARC)
-
11:40
Development of MTCA-based boards for the LLRF at the KEK PF 2.5 GeV ring
-
Daichi Naito
(KEK)
-
12:00
Current Status of the LLRF System for the Muon Linac of g-2/EDM Experiment at J-PARC.
-
Ersin Cicek
(KEK)