10–15 Sept 2023
Tsukuba International Congress Center (EPOCHAL)
Asia/Tokyo timezone
WAO2023 is over. Thanks for your support. Please bring fruitful discussions at WAO2023 back to your community. See you at WAO2025 hosted by Canadian Light Source.

PO40 - Topup injection in the collision operation of BEPCII and key technology

12 Sept 2023, 14:00
1h 30m
Tsukuba International Congress Center (EPOCHAL)

Tsukuba International Congress Center (EPOCHAL)

Speaker

GuangHui Chen (IHEP)

Description

"The BEPCII is designed as an e+/e- attenuating operational collider. In order to improve the BESIII data acquisition, BEPCII has carried out an upgrade project of topup injection operation of high-energy physics experiments. Based on the injection rate, injection interval, beam lifetime and luminance evolution of e+ and e-, the optimized data acquisition time can be calculated. The collision mode topup injection operation has been realized in 2019.
The positron target is the core equipment to realize e+/e- beam switching. The positron target has been improved in the case that the positron source system is not expanded. The beam performance index and operation function have reached the expected result."

Presentation materials