The on-site installation of the Alignment of Hefei Advanced Light Facility (HALF) project commenced in March 2026, with all component installations scheduled to be completed by the end of the year. At present, the preliminary installation of the injector and transport line has been finished, entering the precision alignment stage in the measurement hall. Meanwhile, the preliminary installation...
The Hefei Advanced Light Source (HALF) facility requires a high-precision tunnel control network to support accelerator alignment, equipment installation, and long-term geometric stability. This study focuses on the design and data processing optimization of particle accelerator tunnel control networks. An automated simulation workflow based on laser tracker measurement planning is developed...
As a core component of the Hefei Advanced Light Facility (HALF), the storage ring's magnetic element arrangement accuracy and beam optical performance directly affect the device's operating efficiency and beam quality. To address potential geometric deviations during the installation of the HALF storage ring, this paper focuses on smooth adjustment, establishing an analytical framework from...