27–29 Aug 2025
High Energy Accelerator Research Organization (KEK), Tsukuba Campus
Asia/Tokyo timezone

Operational experience of MTCA.4 modules used at LLRF of SPring-8 storage ring

28 Aug 2025, 11:50
20m
Bldg. #3 Seminar Hall (High Energy Accelerator Research Organization (KEK), Tsukuba Campus)

Bldg. #3 Seminar Hall

High Energy Accelerator Research Organization (KEK), Tsukuba Campus

Speaker

Takashi Ohshima (JASRI)

Description

We had four RF stations in SPring-8 storage ring. We replaced the NIM module based system to MTCA.4 module based system at RF station A in 2018. The replacement of the LLRF system at other three RF stations were carried out step by step. In this talk, operational experience of MTCA.4 modules will be shown.

Presentation materials