Speaker
Description
Insertion devices for synchrotron accelerator are being manufactured for SKIF installation. Two superconducting solenoids for BINP detectors are being developed. The status of these works will be presented in the presentation. Major works are focused on insertions devices for the currently built SKIF – new source of synchrotron radiation research. This project demands 5 insertion devices at the start of the operation in 2026 including superconducting wigglers and undulators. Two of these devices were successfully tested, the rest devices will be ready by the end of the 2025. The 7 T indirectly cooled solenoid for the THz radiation experiments is operating since 2024 on the Novosibirsk free-electron laser. New physical results were obtained in these experiments in the research of free induction decay of the NO, HBr and HCN. The development of the superconducting solenoid for the upgrade of the existing CMD-3 detector is going on. The solenoid will have the stored energy about 800 kJ. The work should be finished in 2028. Also, the development of the superconducting solenoid for next generation project of VEPP-6 detector is started, the parameters of the solenoid will be close to the existing solenoid of the KEDR detector.